BAND-IT: The Preferred Solution for Data Center Cable Management
November 27.2024
Current Solutions: Traditional Cable Cleats and Cable Ties
Ensuring power is properly routed throughout a data center is one of the most important aspects of an installation project, but often the details are left for last. Installers often find themselves using an assortment of rubber channels, brackets, fixings, and ties which quickly add up to be an expensive and time-consuming element of the project. These solutions are often;
- High-Cost Materials
- High Profile
- Heavy
- Require Additional Fixings
- Have Minimal Diameter Adjustment
- A Time Consuming Installation
- Difficult to manipulate and pull cables
- Require Cushion Sleeves
When selecting a fastening solution for routing large amounts of power in data centers, design firms and contractors need to consider the environment they’re building for. Solutions need to be capable of withstanding potential hazards such as short circuit forces, preferably with IEC-standard short circuit testing, and they should also use Low Smoke Zero Halogen materials to prevent against toxic fumes in case of fires. Reducing material bulk wherever possible will reduce costs and complexity, ensuring smoother installation and faster project completion.
BAND-IT has just the product to meet all these specifications while making installation easy, efficient, and cost effective.
The BAND-IT Solution: PPA Coated BAND-FAST Clamps
Our products are simple, have been designed specifically for power cable management, are tested to meet stringent industry standards, and are more cost effective than alternative solutions.
Some of the benefits of our BAND-FAST Clamps include;
- Tested for Short Circuit withstand up to 76kA (per IEC 61914:2015) Click to View Band-Fast® Short Circuit Testing
- Can be installed directly through the ladder rung eliminating additional fixings
- Low smoke halogen free coating eliminating the need for cushion sleeving
- Low profile design for space and weight savings
- Significant diameter reduction – fewer part numbers to be ordered / stocked
- Simple installation tool – quick and easy to install with the C07569 Bantam Tool
- Faster to install than Cleats (or Cable Ties with brackets & cushion sleeve)
- Lighter weight – easier to carry around site
- Environmental benefits – Less energy consumed in production and transportation
- 75% cost saving compared to cleats
For further information about how we can help with your cable management needs, please Contact Us.