BAND-IT BAND-FAST® CABLE CLEATS SUPPORT LEADING GLOBAL DATA CENTER DEVELOPER
A leading global hyperscale data center operator adopted BAND-FAST stainless steel cable cleats across multi-region builds to solve challenges common to modern, high-density power distribution: slow installs, complex sizing, multicomponent hardware and long lead times. BAND-FAST’s post-pull installation, single-piece design and IEC 61914 tested short circuit restraint provided faster installation, simplified planning and consistent performance across project phases in both Europe and Asia.
Across Multiple campuses, BAND-FAST kept schedules moving when alternative cleat suppliers could not meet delivery timelines. Contractors eliminated more than 80% of the sizing and component selection workload and gained installation speed using the DT2000 Digital Banding Tool , while design teams gained confidence through globally recognized cleat performance standards. As hyperscale developers continue rapid market expansion, BAND-IT is ready to support upcoming phases with the same speed, reliability and installation simplicity that kept previous builds on track.
FEATURED BAND-IT PROJECTS
- Multi-facility Build in Western Europe: Large-scale, high-density campus requiring rapid in-tray installation and late-phase spec adjustments.
- High-growth APAC Hyperscale Campus: Accelerated construction schedule across multiple buildings requiring fast delivery and simplified engineering.
Why BAND-FAST Cleats Were Selected
- Proven Short Circuit Performance: IEC 61914:2015 tested strength you can confidently specify, with faster, simpler installation than multi-piece cleats.
- Optimized for High Density Trays: Compact design supports trefoil, in-line and diamond layouts without extra hardware – maximizing tray space.
- Engineer Friendly Documentation: Clear IEC aligned data simplifies calculation, spacing and design decisions.
- Supports Global Builds: In US projects, BAND-FAST helps meet NEC 392.20(C) by keeping single conductors properly secured under fault forces – giving hyperscale teams a fast install and globally consistent cleat solution.